After getting the key to a new house, in fact, many people do not know how to accept it. In most cases, the inspection and acceptance of the house has no choice, because all the decoration has been completed. However, if problems can be detected in a timely manner, the owner will also be able to facilitate accountability. Although it is a layman who accepts new houses, it is still possible to learn some simple methods of acceptance.
Wells Tiles
1 Look at the wall
Now, looking at the condition of the wall has become the most important issue for housing acceptance. Acceptance of this, it is best to see the house on the second day of the rain. At this time, if there are problems such as water leakage, the wall is almost invisible. In addition, it is to see if there is a crack in the wall. This is also the first step in the quality inspection of the project.
2 inspect hydropower
In the current renovation project, most of the hydropower equipment will be replaced in the later period, so these contents are not very important. However, if you do not plan to replace hydropower equipment, you must accept it carefully. In addition to checking whether electricity is available, the inspection of wires is mainly to see if the wires meet the quality of the national standard. Then the cross-sectional area of ​​the wire meets the standard requirements. It is very dangerous to leave such a hidden danger in the decoration process.
3 waterproof
If you do not try before the renovation, leaks will be discovered when the decoration is completed, and the loss will be inestimable. It is not difficult to remove the newly renovated floor and re-do the waterproof layer, but if the loss is caused to the downstairs, the consequences are unpredictable. Acceptance of the waterproof approach is: before the renovation with a cement mortar to make a threshold to block the door, and then take a plastic bag covering the sewage outlet, and then discharge the water for inspection. In addition, you can also check with the owners downstairs.
4 inspection pipeline
When accepting the sewage outlet on the balcony, you can fill it with a container to see if the water can flow smoothly. Do not look inconspicuous, but in the construction of the project, some workers often "stolen" the work when cleaning. In addition, the practice of the project has proved that in addition to drains, balconies and other space should also be done to deal with such as water, the general floor drain can not meet the actual needs. This small place is often the best expression of the level of construction of the builders.
Construction acceptance Bay window decoration entrance decoration new house window house interior decoration house exterior wall tile tile adhesive balcony tile ld tile