What are the operating procedures of Reli Hydraulic Wet Sprayer? How to operate hydraulic wet sprayer safely? Henan Hao Li sprayer manufacturers introduced in detail the operating procedures and precautions of Yuli Hydraulic Wet Sprayer, and he hoped to be helpful for the safe operation of Qian Li wet sprayer.
First, check the hydraulic wet grease lubrication grease pump box, add in time, with a grease gun to switch cylinder joints filled with butter, open the wet sprayer, the motor rotation direction is consistent with the direction of rotation of the pump logo, such as inconsistent Immediately shut down, as long as any two-phase power can be exchanged for the total power supply. Open the tank lid and fill the tank with clean water or at least submerge the piston rod. Water-free movement can rapidly damage the shaft seal and concrete cylinder piston.
2. Fill up the hopper with a 1:1 mixture of cement and water or clean water. Pump the lubrication conveying pipe. Before adding the normal material, open the discharge port to release the remaining clean water or mud in the hopper and open the air supply valve. Add normal material and start spraying.
Third, after the use of hydraulic wet wet spray machine, the hopper to inject clean water, clean the pipeline and hopper residual mortar, remove the pipeline, artificially rinse the nozzle with water, dry after use.
4. Check whether the delivery pipe and the mixed flow pipe are clean, blow clean and reserve, insert the cleaning ball into the discharge port, and inhale the pump, pump out and clean the inside of the S pipe.
Fifth, the additive pump and the additive tube cleaning, first insert the straw into the water, flush the water, clear water, open the air valve, blow clean and reserve.
6. After the oil pump stops, rotate the left and right cylinders to move the button, and release the accumulator pressure to zero.
7. After the hydraulic wet sprayer is cleaned, shut it down.
VIII. Operational precautions for the hydraulic wet sprayer:
1. Start the hydraulic wet sprayer to operate at idle. If the temperature is low, the idle running time should be longer and the temperature of the hydraulic oil must be raised to 15 degrees Celsius for pumping.
2. During the spraying process, strict attention should be paid to the actual mixing quality and slump of the concrete. If the stirred concrete does not meet the pumping requirements, it must be removed.
3, hopper net should not be full of concrete, on the Internet of ultra-grain aggregates and debris should be promptly removed, the hopper in the concrete can not be too small to prevent the pipe due to suction and lead to blockage, when the feed can not keep up When you want to stop in time.
4. When the spraying operation is to be interrupted for a long time, the mixing work in the hopper should be stopped, otherwise the coarse aggregate in the concrete will sink. When the pump is pumped again, it should be stirred first, and it must be performed in the forward and backward pump operations. After the trip can be restored to normal.
5, in the spraying process, we must always observe the pressure and lubrication of the various instruments on the pump, if there is an exception, it should be ruled out in time to ensure the normal spraying.
First, check the hydraulic wet grease lubrication grease pump box, add in time, with a grease gun to switch cylinder joints filled with butter, open the wet sprayer, the motor rotation direction is consistent with the direction of rotation of the pump logo, such as inconsistent Immediately shut down, as long as any two-phase power can be exchanged for the total power supply. Open the tank lid and fill the tank with clean water or at least submerge the piston rod. Water-free movement can rapidly damage the shaft seal and concrete cylinder piston.
2. Fill up the hopper with a 1:1 mixture of cement and water or clean water. Pump the lubrication conveying pipe. Before adding the normal material, open the discharge port to release the remaining clean water or mud in the hopper and open the air supply valve. Add normal material and start spraying.
Third, after the use of hydraulic wet wet spray machine, the hopper to inject clean water, clean the pipeline and hopper residual mortar, remove the pipeline, artificially rinse the nozzle with water, dry after use.
4. Check whether the delivery pipe and the mixed flow pipe are clean, blow clean and reserve, insert the cleaning ball into the discharge port, and inhale the pump, pump out and clean the inside of the S pipe.
Fifth, the additive pump and the additive tube cleaning, first insert the straw into the water, flush the water, clear water, open the air valve, blow clean and reserve.
6. After the oil pump stops, rotate the left and right cylinders to move the button, and release the accumulator pressure to zero.
7. After the hydraulic wet sprayer is cleaned, shut it down.
VIII. Operational precautions for the hydraulic wet sprayer:
1. Start the hydraulic wet sprayer to operate at idle. If the temperature is low, the idle running time should be longer and the temperature of the hydraulic oil must be raised to 15 degrees Celsius for pumping.
2. During the spraying process, strict attention should be paid to the actual mixing quality and slump of the concrete. If the stirred concrete does not meet the pumping requirements, it must be removed.
3, hopper net should not be full of concrete, on the Internet of ultra-grain aggregates and debris should be promptly removed, the hopper in the concrete can not be too small to prevent the pipe due to suction and lead to blockage, when the feed can not keep up When you want to stop in time.
4. When the spraying operation is to be interrupted for a long time, the mixing work in the hopper should be stopped, otherwise the coarse aggregate in the concrete will sink. When the pump is pumped again, it should be stirred first, and it must be performed in the forward and backward pump operations. After the trip can be restored to normal.
5, in the spraying process, we must always observe the pressure and lubrication of the various instruments on the pump, if there is an exception, it should be ruled out in time to ensure the normal spraying.