Model NO.: JDKS021
Customized: Customized
Assembing Method: Rubber
Cutting Material: Marble Quarry/Block
OEM&ODM: Yes
Delivery Time: 7-10days
Linear Speed: 25-35m/S
Trademark: JDK
Transport Package: Wooden or Carton Box
Specification: SGS&CE
Origin: Quanzhou, China
HS Code: 82079010
Diamond Wire Saw For Marble Quarry/Block | ||||
Features: | Â | Â | Â | Â |
1.Reducing the waste of quarry resource. | ||||
2.Working in low noise with no dust. | ||||
3.High putout and cutting efficiency | ||||
 |  |  |  |  |
Specification | Assembing Method  | Beads/meter | Application | Linear Speed |
Φ10.5 | Spring | 28 | Soft marble | 30-35 |
Φ11.0 | 28 | Medium marble | 28-30 | |
Φ10.5 | Rubber | 40 | Hard marble | 25-28 |
Φ11.0 | 40 | Dry cutting marble | 20-25 |





Other Specifications Are Available Upon Request.
Our Feature:
Factory == Own Exporting License == Quality Control == Competitive Price == Own Technology == OEM
Our advantage:
1. Manufacturer with more than 15 years experience
2. A great quantity of formula special for all kinds of different stone
3. Approved quality with factory competitive price
4. Long lifespan, good sharpness, stable performance and high cutting efficiency
5. Sandwich, groove type segment with shape straight, trapezia, boatshape, K, V, etc
6. Custom-design can be meet upon request, small trial order available any time, sample for testing can be delivery in very short time.
Payment:
T/T, Western Union, L/C, Cash
Delivery time:
For samples, shipped within 3 days after receiving the deposit,
For regular order, around 3-7 days, depends on the quantity of your order.
Packaging:
The inner packaging is carton box .The outer packaging is carton box Or woodencase.(If by air ,carton box will reduce the weight, if by sea, we suggest woodenbox for waterproof.
Shipment:
<45kg, express service is recommonded
>45kg, air or sea is a better choice 45kgs
Â
The start of the shield machine refers to a series of work in which the shield machine is driven from the tunnel door to the undisturbed soil section by using the temporarily assembled pipe segments, Reaction Frame and other equipment of the working shaft. Reinforcement of the starting end, installation of shield machine, starting bracket, assembly of shield machine, installation of reaction frame, shield machine system debugging.
Starting Frame,Shield Launching Frame,Shield Starting Base Structure,Starting Base Frame
Anshan Lijian Engineering Group Co. LTD , https://www.lijianformwork.com