The quality of bathroom decoration is related to whether people's daily life is comfortable. When people are renovating a house, the bathroom has become a key point in home decoration. Some people do not understand toilet decoration , so what is the bathroom decoration process ? Simply introduce to everyone the bathroom renovation process .
Bathroom renovation process
1, hydropower reform
When we are decorating the bathroom, the first thing we must do is hydropower reform. The water and electricity renovation of the bathroom includes bathroom heater heating and water pipe in-wall treatment. Before the hydropower reform, we must first consider the bathroom needs to install the bathroom equipment and the location of the installation, we can determine the construction program, you can set aside some sockets to prevent the need to add electrical appliances.
2, waterproof treatment
Waterproofing is one of the most important items in bathroom renovation. Generally, the bathroom floor should be coated with waterproof coating twice. The waterproof layer should be about 250mm above the ground. After the protective layer is properly prepared, the floor surface is waterproof, and the bathroom wall is also Need to do a good job of waterproofing, bathroom wall waterproof layer is best to do the top, after the waterproof project is done, we must not forget to do a 24-hour closed water test.
3, tiling
Because the bathroom is relatively humid, we choose the bathroom tile, the best choice for tiles with better anti-slip waterproof performance, such as the surface of the ceramic tile with concave and convex texture, tile style pattern can be selected according to the actual situation of the bathroom and other conditions, we are in the shop When the tiles are tiled, the gap between the tiles cannot be too small. After the tile is attached, an empty drum inspection is also required.
4, bathroom ceiling
Usually when we decorate the bathroom, we will install ceilings to the bathroom. The ceiling of the bathroom is best selected for materials with good properties such as moisture-proof and waterproof, such as aluminum buckles. When installing the ceiling, we must first determine the installation location of the electrical appliances and keel, and then install the keel and aluminum buckle. The height of the ceiling of a typical bathroom is between 2.2m and 2.4m. When installing the keel, it must be installed flat. It is better to fix the keel, exhaust fan and other items with the keel first. When installing a bathroom ceiling, don't forget to set a checkpoint.
5, toiletries
Finally, we can install bathroom products. We can choose the style and size of the bathroom products according to the size and style of the bathroom space. When we install the bathroom products, the water heater is best installed on the load-bearing wall, between the water heater and the wall. Also keep enough space.
Xiao Bian summary: About the bathroom decoration process Xiao Bian introduced here, I hope that after reading this article, I can give you reference and help.