As we all know, hydropower reform in hidden projects can be described as a very important step in the home improvement process. Once the renovation fails, it will cause great inconvenience to future life. Therefore, we must be cautious and cautious when it comes to acceptance. Missing any link, today, Xiao Bian will give you a brief introduction to the ten standards of hydropower acceptance!
First, the circuitThe slot depth of the circuit on the wall should be 1.5 times the diameter of the pipe. The line pipe should be fixed with a pipe bender at the corner and the length should be 200 mm. The connection between the line pipe and the line pipe must have a lock mother, and the interface should be glued tightly.
Second, the box
Whether strong or weak, the distance between the same circuit box is 5 cm, but if it is strong and weak, the distance between the box is 150-200 mm.
Third, heating wiring
If the floor is installed with ground heating, the circuit can not be installed again. Otherwise, the heating structure will be damaged, resulting in poor heating.
Hydropower installation of hydropower acceptance hydropower reform hydropower stage
Single Chafer Mobile Cutlinary Station,Chafer Mobile Cutlinary Station,Mobile Cutlinary Station,Chafing Dish Buffet
Shaoxing Biaoyi Hardware Products Co., Ltd. , https://www.byeob.com