1 Waterproof treatment: the ground floor of the first floor needs to be waterproofed;
2 plain treatment: sanding, repairing and dust removal according to the condition of the plain;
3 epoxy primer: using a strong and adhesive epoxy primer to roll together to enhance surface adhesion;
4 epoxy intermediate coating: add epoxy resin to an appropriate amount of quartz sand, and evenly coat it with a file;
5 epoxy soil: According to the actual needs of the construction of several roads, it is required to achieve a flat non-porous hole, no batch of knife printing and sanding printing shall prevail;
6 self-flowing flat paint: evenly spread with a self-leveling epoxy topcoat. After completion, the whole ground will be bright and clean, the color is uniform, and there is no empty drum;
7 Construction completed: 24 hours before you can go to the person, 72 hours can be stressed. (25 °C shall prevail, and the low temperature open time shall be moderately extended.)